Q. What NDT is performed at the project site once the joints have been constructed?
All joints are installed compliant to the Stealth-Lock engineered standards and specifications including but not limited to; surface preparation, elongation dimensions, compliant insertion depth requirements, and visual inspection.
Once the pipeline is completed and ready for handover, all projects are hydrotested prior to hookup and hydrotests are performed in accordance with the specific client specifications and standards governing the project. Typical hydrotest maximum pressures are set at either 125% or 150% of the pipeline designed Maximum Allowable Operating Pressure (MAOP).
The fact that no expensive, time-consuming and hazardous radiography is required also improves the commercial and safety values of each and every Stealth-Lock project. More importantly perhaps is the fact that as a company, Stealth-Lock not only engineers and manufactures it’s own pipe joining equipment but the company is also ultimately responsible for the installation and quality compliance of each and every joint, in every field of operations, in every part of the world.